In construction, an RFI is a request for information. These are the ones business owners and landlords send us most, answered plainly. Don't see yours? Send it in.
For most permitted commercial work, yes. Utah cities generally require a licensed contractor to pull the permit. A GC also schedules every trade, manages inspections and carries the insurance, so you deal with one accountable party instead of a dozen subcontractors.
We price the work, pull the permit, hire and schedule every trade, run inspections and hand you a finished, approved space. You get one contract and one point of contact from site walk to certificate of occupancy.
Yes. D.A. Seui Construction, LLC holds Utah B100 General Building Contractor license #12815061-5501 and carries general liability insurance. Certificates are available on request.
Salt Lake, Davis, Utah and Summit counties, including Salt Lake City, Murray, Sandy, West Valley, Bountiful, Layton, Provo, Orem, Lehi, Springville and Park City.
It depends on the design and layout more than the square footage. The biggest drivers are plumbing and electrical changes, HVAC, finish level and the condition of the existing space. After a site walk we give you a line-item bid by trade, so you can see exactly what moves the number.
Every bid is broken out line by line by trade, organized by CSI division, with allowances and exclusions written out. You can compare it against any other bid and see exactly what's included.
No. Site walks and bids are free. We meet you at the space, walk the scope with you, and follow up with a line-item bid.
Typically 5,000 SF and up, but we're happy to take on smaller projects too. If you're not sure your project fits, send it over and we'll tell you straight.
For nearly all work that changes walls, plumbing, electrical or mechanical systems, yes. Cosmetic work like paint and flooring often doesn't. We confirm with your city during pre-construction and pull the permit for you.
Most permitted commercial work needs stamped drawings. If you don't have plans yet, we can start from a layout or photos and connect you with designers we work with.
It can. Alterations often require accessibility upgrades to restrooms and the path of travel to the altered area. We check this before we bid so it's in the number, not a surprise.
It comes down to scope, permit review time in your city, and long-lead items like HVAC units or storefront glass. We build the schedule backward from your opening date and show you the critical path before work starts.
Usually, yes. We phase the work into zones, seal them off, and schedule loud work and shutdowns after hours so you can keep serving customers.
Yes, for pre-construction. Walking the space and pricing it before you sign helps you negotiate the right TI allowance and avoid surprises.
Yes, when the project calls for it. We'll lay out which phases need off-hours work in your schedule and bid.
Ask it with your project details and we'll answer it in our reply.